Project Deliverables

D1.1 Summary Report on Engineering and Preparation for retrofitting

  D1.2 Report on retrofitting

D1.3 Report on results of demo

D2.1 Preliminary report land-based testing

D2.2 First Report on Work Procedure and Best Practice Methods for Retrofitting

  D2.3 Second Report on Work Procedure and Best Practice Methods for Retrofitting

D2.4 Summary report of results of land-based testing

D3.1 Summary report on Separaptor
 

D3.2 Summary report on membranes operation

D3.3 Summary report on TEE and catalyst regeneration operation

  D3.4 Summary Report on Carbon Capture Machine Operation

  D4.1 First Report on End System Requirements and KPIs

  D4.2 Second Report on End System Requirements and KPIs

  D4.3 Third Report on End System Requirements and KPIs

  D4.4 Fourth Report on End System Requirements and KPIs

  D4.5 Fifth Report on End System Requirements and KPIs

  D4.6 First Report on Quality, Health, Safety, Regulatory and Environmental Documents, and Standards

  D4.7 Second Report on Quality, Health, Safety, Regulatory and Environmental Documents, and Standards

D4.8 Summary of TEA

  D4.9 Summary of LCA and SEA

D5.1 Report on API specification
 

  D5.2 Technical Requirment & Development Guide

  D5.3 Report on GDPR and Cybersecurity measures

D5.4 First report - Technical operational & user-manual

D5.5 Second report: Technical operational & user-manual
 

  D5.6 Instructions Handbook

  D5.7 Validation & Evaluation Reports

D6.1 Summary report on the Initial Dissemination and Communication Plan

D6.8 Report on First Virtual Reality 3D video and Release project video

  D6.10 First Exploitation Report

  D6.11 Second Exploitation Report

  D6.12 Third Exploitation Report

D7.4 Second revision of the Data Management Plan (DMP)

 

Preliminary Results

Media Kit