D1.1 Summary Report on Engineering and Preparation for retrofitting
D1.2 Report on retrofitting
D1.3 Report on results of demo
D2.1 Preliminary report land-based testing
D2.2 First Report on Work Procedure and Best Practice Methods for Retrofitting
D2.3 Second Report on Work Procedure and Best Practice Methods for Retrofitting
D2.4 Summary report of results of land-based testing
D3.2 Summary report on membranes operation
D3.4 Summary Report on Carbon Capture Machine Operation
D4.1 First Report on End System Requirements and KPIs
D4.2 Second Report on End System Requirements and KPIs
D4.3 Third Report on End System Requirements and KPIs
D4.4 Fourth Report on End System Requirements and KPIs
D4.5 Fifth Report on End System Requirements and KPIs
D4.6 First Report on Quality, Health, Safety, Regulatory and Environmental Documents, and Standards
D4.7 Second Report on Quality, Health, Safety, Regulatory and Environmental Documents, and Standards
D4.9 Summary of LCA and SEA
D5.2 Technical Requirment & Development Guide
D5.3 Report on GDPR and Cybersecurity measures
D5.4 First report - Technical operational & user-manual
D5.6 Instructions Handbook
D5.7 Validation & Evaluation Reports
D6.1 Summary report on the Initial Dissemination and Communication Plan
D6.8 Report on First Virtual Reality 3D video and Release project video
D6.10 First Exploitation Report
D6.11 Second Exploitation Report
D6.12 Third Exploitation Report
D7.4 Second revision of the Data Management Plan (DMP)